It is proposed that the space in the Tower of the premier office quarter STONE Hodgink H3. Plan room H3-905
On the floor all over the perimeter, the glazing, the depth of the premises ~10.5 m. The floors allow both the office planning decisions and the open space format. The ceiling height is 3.65 m. Architecture from PARSEC lacon design and modern materials. High glazing and energy-efficient glazing. Eye lines from aluminium flames and a monumental base in the natural stone.
Modern engineering decisions.
Accurate-extractive ventilation system with cooling and heating function, as well as a plastic recovery system. Multi-stage air treatment system.
Central round air conditioning
Automatic fire alarm, fire-fighting and warning system
Quiet speed elevators equipped with an intellectual passenger traffic control system. Additional separate elevators are provided for the maintenance of the building.
24-hour perimeter surveillance, parking and cycling.
A well-established territory integrated into urban park space. Developer infrastructure: office quarter, staff dining room, premium phytness, pharmacy, beauty parlors, cafe and summer choir restaurants. The maximum isolation is the tower (13 floors) within the premier office quarter of STONE Khodink. Their own two-light lobby and the elevator team, including underground parking. Functional planning decisions and broad possibilities for the establishment of an office, taking into account company business processes. Possibility of a company logo on the building's facade. July 2024 - building permit. III by 2027 - building readiness - Photographed by developers.