Selling the office space. Preparedness: 2027, office floor planning meets the requirements of the functional office, which will allow space to be built for business needs. The depth of the premises is 8 to 10 metres, the ceiling height is 3.65 m, the cologne step is 8.4. The floor windows will provide a high level of insulation and provide for the possibility of natural heating. The premier office area will be equipped with all modern engineering systems: central air conditioning, advanced air ventilation and multi-level treatment system. The possibility of natural heating is added. The business centre will be equipped with advanced speed elevator equipment with an intellectual passenger traffic control system. The built-in residential environment underlines the premia of the location. H1 is a 100-metre business centre. A new project on Hodginca with a direct exit to the park. STONE Khodinka is the premier of the year from office develper No. 1. A premier office block in the Leningrad Business Corridor, right out to the park of Khodin Field. The architecture of the premium office block from the PARSEC bureau combines laconutical design and use of modern materials. The office towers will be carried out in a panorama glacier of aluminium alleys and their base will be from a natural stone. The central part of each tower will be the designer two-light lobbies that will connect the area of the premier office block with the landscape park of the Khodin field. Lobby spreads visually through panoramic glazing and high ceilings, and the view of the park will be part of their interior, which in turn will provide maximum physical and emotional comfort to STONE Hodyk staff and guests.