The office block is being sold in shell volume. The state of separation will allow space to be zoned and repaired to its mission. The facility is equipped with: low-cost networks - telephone and Internet access. The equipment meets fire and sanepidemiological standards. 24-hour access to the building. High-quality separation of public areas, the " ABB " (Germany) reserve electricity supply system, the "PowerLink " (Veliquidation), high-speed " KONE " elevators (13 p.m.) In the building, a developed infrastructure that facilitates the comfort and recreation of the tenant-cast, coffee shops, stores, underground parking at 197 m/m.