It's a full floor. Separate work is being carried out in the premises, in a state of separation - July 2025. Closing load 450 kg/m2. 24-hour security, access control system. A live glazing with opening. Volume height: 3.6 m. The building is located in an active business part of the capital. On the basis of the architectural project, the principle of " tectonic shifts " : the displacement of parts of the building relative to each other. Natural, natural materials were selected as internal design of the building. The business centre ' s residents are provided with a well-functioning roof and comfortable terrace. The overall concept of the project is also reflected in the design of lobbying and public spaces. The original design of the building was created by the Blank Architects, which has dozens of projects and hundreds of thousands of designed square metres in Russia and Europe. Renders are represented.